Shock Pad laid for Full Size Synthetic Football Pitch - Durham Johnston School

The Shock Pad has been installed onto the new 3rd generation synthetic Football pitch at Durham Johnston School by Brambledown. The large area was completed in two days and is now ready for the synthetic carpet to be laid on top of the shock pad base. The synthetic will be rolled into place next week and then line marked soon after.

Today’s modern training programs require long hours of intense, repetitive training on the pitches. To prevent stress injury, a track surface needs to deform evenly in order to properly absorb and return energy, hence the implementation of an underlying shockpad. A track surface also needs to have a consistent response to allow athletes to execute relaxed high-speed training. Long pile or third generation pitch surfaces have been used for Football training at all levels for many years in the UK and the Durham Johnston School will be left with a first class sports pitch when complete.

Brambledown are then ready to move onto the multi use games areas and the grass pitches which will be completed before the summer in time for the grass to mature.

 

Bookmark and Share

<< Other News

Brambledown News

Spen Brook Court Landscaping

Commercial Landscape Works were completed last week at Spen Brook Court in Blackpool. Brambledown Landscape Services Ltd have completed hard and soft

Read More

Cheshire Oaks Topiary Planters

Brambledown Landscape Services Ltd have just completed sourcing, supplying and planting hundreds of large topiary planters at the Cheshire Oaks shoppi

Read More

Beacon of Light Sunderland

Brambledown Landscape Services Ltd are very proud to have been a part n the External Works and Landscaping at the new Beacon of Light outside the Stad

Read More

Scarborough Holiday Park Opens

Brambledown have completed a million pound makeover of one of The UKs most prestigious Holiday Parks in Scarborough.  Planting tens of thousands

Read More
More News